In Ontario, the operator of a vehicle carrying excess soil must have a hauling record at all times unless an exemption under the regulation applies, and for a project that must complete the excess soil reuse planning requirements, the project leader files a notice in the Excess Soil Registry before any excess soil leaves the project area.

Ontario’s Excess Soil Regulation puts a hauling record on every vehicle carrying excess soil, subject to the exemptions in the regulation. For a project that must complete the reuse planning requirements, the same regulation requires the project leader to file a notice in the Excess Soil Registry before any excess soil leaves the project area. This guide explains who those duties fall on, how long records are kept and which papers to ask for when you buy an Ontario excavation company.

It covers the regulation’s terms, the hauler’s duties, record keeping, the Registry, the cases where an excavation company is itself the project leader or reuse-site operator, and the records to request. For the national picture, see buying an excavation and earthworks contractor in Canada.

What the Excess Soil Regulation is and who it covers

Under the Excess Soil Regulation in Ontario, “excess soil” means soil, crushed rock or soil mixed with rock or crushed rock, that has been excavated as part of a project and removed from the project area for the project. The Ontario regulation defines the project leader as the person or persons who are ultimately responsible for making decisions relating to the planning and implementation of the project. It defines a reuse site as a site at which excess soil is used for a beneficial purpose, and that definition does not include a waste disposal site.

The Ontario regulation applies to excess soil, and it does not apply in respect of hazardous waste, hauled sewage, asbestos waste or other types of waste within the meaning of Regulation 347. From 1 January 2023, notices about how excess soil is reused and disposed of have been filed under Ontario’s regulation, and Ontario says project leaders, owners and site operators have requirements to file notices for certain project areas, certain reuse sites and residential development soil depot sites. Ontario’s Resource Productivity & Recovery Authority (RPRA) is responsible for establishing and maintaining the Excess Soil Registry where those notices are filed.

For an excavation company, the practical point is which role it plays on each job. The sections below take the hauler role first, then the project leader and reuse-site roles.

The hauler’s duties: the hauling record

The Ontario excess soil fact sheet says haulers are required to carry a physical or electronic hauling record at all times during transport of excess soil, unless an exemption under the regulation applies. A copy of that record must be provided to other specified people. The fact sheet says the regulation does not mandate a specific form of hauling record, but instead specifies the information required to be included in the record.

The fact sheet says the owner or operator of the site at which the soil is loaded has a responsibility to ensure that the record is created and that the information in it is correct, and that the operator of the site at which the soil is deposited must acknowledge in the record that the soil was received. It adds that the hauler and the loading-site owner or operator are responsible for making sure the record has all required information. Among the information the fact sheet lists as required when a hauler leaves a project area or other site with excess soil is the name, telephone number and email address of an individual at the site where the soil is to be deposited, who may be contacted to respond to inquiries regarding the deposit.

When a hauler reaches the destination identified in the hauling record, the fact sheet says the date and time the load was deposited is added. Once the record is completed, a copy of the final hauling record shall be provided to the individual at the deposit site who made the declaration. After the soil is deposited, a new hauling record must be developed when the hauler moves on to the next load.

Exemptions for small loads

The Ontario fact sheet lists an exemption from the hauling record where the total amount of dry excess soil removed and transported from a project area is 5 m³ or less. It lists another where the total amount of dry excess soil being taken to and finally placed at a reuse site for a specific undertaking is 5 m³ or less. In both cases the fact sheet says the operator of the vehicle must still be able to provide the information that would otherwise be required in the record to a provincial officer, if requested.

Where the soil goes

The fact sheet says that under no circumstances should the hauler bring the soil to a site for deposit without first contacting the owner or operator of the site where the excess soil was loaded to obtain their concurrence. If the excess soil is denied at a deposit location due to concerns regarding its quality, the fact sheet says it should be returned to the site where it was loaded or taken to an appropriate waste disposal site. Ontario’s Excess Soil Regulation also says the owner or operator of the loading site shall identify contingency measures for the case where the soil cannot be deposited at the intended site.

Owners and operators of vehicles transporting excess soil must take steps to ensure that the soil is deposited at a site that is authorized to accept that load, according to the fact sheet. If the owner or operator of a vehicle causes, permits or arranges for the unlawful deposit of waste excess soil at a site, the Ontario fact sheet says that person may be prosecuted for contravening sections 27 and 40 of Ontario’s Environmental Protection Act and may be subject to a waste removal order issued by the Ministry. The owner and operator of a vehicle must follow section 16 of Ontario’s Regulation 347 if the excess soil they are transporting is waste.

The Ontario fact sheet says a waste-related environmental compliance approval (ECA) or environmental activity and sector registry (EASR) registration is not required for the transportation of excess soil. It adds that vehicle rules still apply, starting with the rule that the excess soil is collected and transported in a vehicle that has been constructed to enable the excess soil to be transferred safely and without nuisance. Ask a lawyer to confirm what that point means for the company you are buying. For definitions, see environmental compliance approval.

Record keeping

Under Ontario’s Excess Soil Regulation, a person transporting excess soil and all persons mentioned in subsection (1) of the same section shall retain a record required under section 18 for at least two years after the day the excess soil was loaded for transportation. The fact sheet names the hauler, the project leader, the owner or operator of the loading site and the owner or operator of the deposit site as responsible for keeping a copy of completed hauling records for every load of excess soil transported, for at least two years after the day the soil was loaded.

In Ontario, subject to subsections (3), (5) and (6) of the retention section, the regulation requires specified persons to retain every document and record they created or acquired under it for at least seven years after the date the document or record is created or acquired. Those persons include a project leader or operator of a project area, and an owner or operator of a reuse site, among others.

Under the Ontario regulation, if a project leader or operator of a project area has entered into any contracts relating to the management of excess soil from the project area, including the transporting of excess soil from it, that person shall retain the contract for at least seven years after the date the contract was entered into. The fact sheet for project areas puts it more loosely, saying project leaders are required to keep copies of most documents they create or receive for seven years. The regulation also says an electronic tracking system may be used to comply with the hauling-record section.

The Excess Soil Registry and the project leader’s notices

Ontario’s Ministry fact sheet says section 8 of the regulation requires the project leader to file a notice in the Excess Soil Registry, developed and implemented by RPRA, before any excess soil leaves the project area, for projects that must complete the excess soil reuse planning requirements. RPRA says Ontario’s Minister of the Environment, Conservation and Parks directed it to establish and maintain the Registry to record excess soil generation and movement. The Ontario regulation defines the Registry as the registry described in section 50 of Ontario’s Resource Recovery and Circular Economy Act, 2016.

The notice includes the name and contact information for the project leader or leaders, the operator of the project area and the qualified persons, and the fact sheet says it must also include key information identified in a schedule to the regulation. The reuse planning requirements named in the fact sheet include filing a notice in the Excess Soil Registry for the project and implementing a tracking system, alongside a qualified person’s assessment of past uses, a sampling and analysis plan, a soil characterization report if necessary and a destination assessment report.

Under the Ontario regulation, a project leader required to file under section 8 shall ensure that, within 30 days after all soil that will become excess soil once removed has been removed from a project area, local waste transfer facility or Class 2 soil management site, the notice is updated. If a project leader or a person authorized to file on their behalf becomes aware that the notice is no longer complete or accurate, the regulation requires the notice to be updated within 30 days after that person becomes aware. Before depositing excess soil at a Class 1 or Class 2 soil management site, reuse site, local waste transfer facility, landfilling site or dump, a project leader required to file a notice shall ensure the notice’s location information is for the applicable location.

In Ontario, the project leader may, before filing a notice, remove from the project area soil that will become excess soil once removed, if the conditions listed in section 8(3) of the regulation are satisfied. Those conditions include that a sampling and analysis plan is required and sampling at the project area is impracticable, that the soil goes to a local waste transfer facility or a Class 2 soil management site for that sampling, and that the sampling is done promptly on delivery. If soil is removed this way, the project leader must still ensure the notice is filed in the Registry before the excess soil is transported from that facility or site to a Class 1 soil management site, reuse site, landfilling site or dump.

Under the Ontario regulation, a project leader required to file a notice must also, before removing the soil, develop and apply a tracking system, in accordance with the Soil Rules, to track each load of excess soil during its transportation and deposit. The fact sheet says the tracking system includes procedures to account for each load of excess soil moved from a project area, including its general quality, quantity and verification of the final site at which it was deposited. Hauling records can be a component of these tracking systems.

Under the Ontario regulation, a project leader is not required to ensure the preparation of the documents under sections 11, 12 and 13 or to develop and apply a tracking system under section 16 if the excess soil is excavated as part of an infrastructure project and the project leader intends, after removal, to deposit it for final placement as part of an infrastructure undertaking. In that situation the fact sheet says a notice on the Excess Soil Registry is still required, but the other reuse planning requirements are not.

When the excavation company is the project leader or a reuse-site operator

The fact sheet for project areas says the regulation places the responsibility to ensure the reuse planning requirements are met on the project leader, and that this does not prevent contractual arrangements resulting in other people completing these requirements on behalf of a project leader. For a buyer, that makes each job’s contract the place to see who was doing what. Whether an excavation company’s own staff filed notices, or a client did, is a question for the seller and the contract file.

Ontario’s handling excess soil page says that if you are moving soil to or from your site, you may need to file a notice in the Excess Soil Registry for certain projects, for larger reuse sites and for all residential development soil depots. It says project leaders, owners and site operators have requirements to file notices for certain project areas, certain reuse sites and residential development soil depot sites.

In Ontario, subject to subsections (1.1) and (2) of section 19, the reuse-site section of the regulation applies to the owner or operator of a reuse site at which at least 10,000 m³ of excess soil is expected to be deposited for final placement in respect of an undertaking. The Ontario page describes this as requiring larger reuse sites (10,000 cubic metres) to register and develop procedures to track and inspect soil received. Within section 19, the owner or operator shall update the notice within 30 days after becoming aware that it is no longer complete or accurate. The owner or operator shall also ensure that, within 30 days after the final load for final placement in respect of an undertaking has been deposited, the notice includes the information the regulation lists.

A reuse-site owner or operator must consent in writing to accept the excess soil from a specific project area or interim site, according to the project-areas fact sheet, which says the written consent is not required if the reuse-site owner or operator is the same as the project leader. For a residential development soil depot, the owner or operator of a depot whose management of excess soil is exempt under section 7(1) files its notice in the Registry before the excess soil begins to be deposited.

Records to request from the seller

The list that follows is a set of requests to make of the seller. Each request below ties to a record the regulation or the fact sheets describe, and the table summarizes the retention periods.

  • Hauling records for recent loads, since the regulation sets a period of at least two years after loading for a record required under section 18.
  • Copies of the Excess Soil Registry notices the company filed as project leader, and any updates, since the regulation sets 30-day update periods in the cases above.
  • Contracts with project leaders and other clients on soil management and hauling, since the regulation requires a project leader or operator of a project area to retain such contracts for at least seven years.
  • Any written consents to accept soil, where the company ran a reuse site.
  • The tracking system records for projects where the company was the project leader.

Retention periods in the Ontario excess soil sources

RecordWho keeps itHow long
Hauling record (section 18)The person transporting the soil and the persons in the retention section’s subsection (1)At least two years after the day the soil was loaded
Documents and records created or acquired under the regulationSpecified persons, including a project leader or operator of a project area, subject to subsections (3), (5) and (6)At least seven years after the date created or acquired
Contracts on managing and transporting excess soilA project leader or operator of a project area that entered into themAt least seven years after the contract was entered into
Registry notice update after soil removalThe project leader who filed under section 8Within 30 days after all the soil has been removed
Summarized from the Ontario Excess Soil Regulation and the Ontario excess soil fact sheets.

Questions to ask before you buy

  • On which jobs was the company the project leader, and on which was it only the hauler or contractor?
  • Can the seller show hauling records for recent loads, and who kept the copies?
  • Which jobs needed a notice in the Excess Soil Registry, and were they updated?
  • Did any deposit site refuse a load, and where did the soil go?
  • Does the company own or operate a reuse site, and has it kept the written consents?
  • Has any regulator contacted the company about soil it hauled?
  • Which contracts with project leaders move filing and tracking work onto the company?

Questions people ask

Short answers; each links to the full page.

Does an asset buyer inherit environmental cleanup liability in Ontario?
Not automatically. In Ontario, a cleanup order for a discharge is aimed at whoever caused or permitted it, but a buyer who takes the land or runs the operation becomes an owner or person in control, and an existing order can bind a successor or assignee of the person it was directed to. Full answer
Does a business that owns its land need an environmental assessment?
In Ontario, a business that owns its land does not automatically need an environmental assessment to be sold: whether one makes sense depends on the property’s history and use. Ask whether a buyer’s lender will want one, and note that Ontario cleanup orders are often directed at whoever currently owns or controls the land. Full answer
What should I ask about an excavation company’s trucking and dump site fees?
Ask whether the company runs its own dump trucks or hires them, how drivers are paid, and which dump sites it uses. Then ask how site fees reach the customer: built into bids, billed at cost or absorbed. Request recent tickets and invoices to see what the company actually paid. Full answer
How do I find out whether an excavation company sells or hauls away its fill and topsoil?
Ask the owner to walk you through where excavated soil goes: sold to buyers, trucked away at a cost, reused on other jobs or stockpiled. Then check invoices and the books to see whether fill and topsoil appear as income, as a cost or not at all. The answer changes how profit is made. Full answer

Related reading

13 pages on the same subject, grouped by topic.

Sources

Every requirement and figure referenced in this guide traces to a primary source. Links were last confirmed on the dates shown.

  1. 01
    Government of Ontario (e-Laws)Government
    O. Reg. 406/19: On-Site and Excess Soil Management
    ontario.ca·Checked Oct 25, 2026
  2. 02
    Government of OntarioGovernment
    Excess soil fact sheets: Excess soil transportation
    ontario.ca·Checked Nov 19, 2026
  3. 03
    Government of OntarioGovernment
    Handling excess soil
    ontario.ca·Checked Nov 19, 2026
  4. 04
    Government of Ontario (Ministry of the Environment, Conservation and Parks)Government
    Excess soil fact sheets: excess soil management and reuse requirements for project areas
    ontario.ca·Checked Nov 19, 2026
  5. 05
    Resource Productivity and Recovery AuthorityRegulator
    Excess Soil Registry
    rpra.ca·Checked Oct 25, 2026