How does a post-frame barn builder schedule concrete and framing crews?
Concrete and framing depend on each other, so the schedule is mostly about sequence and waiting. Ask how the builder lines up the post footings, the framing and any concrete floor, who does each step, and what happens to a crew when weather or a late delivery stops the next trade.
A post-frame job moves in stages, and each stage waits for the last. Ask the seller to walk you through a typical job from site prep to the final roof panel, and mark where crews are idle. Those gaps cost money, so look at how the builder fills them with other work.
Find out who does the concrete. If it is the builder’s own crew, ask about the tools and training behind it. If an outside trade does it, ask how that trade is booked, how reliable it is in busy months, and whether the builder has a backup. Have your lawyer review any standing arrangements with outside trades.
Look at the scheduling method itself. Is it a board, a spreadsheet, a calendar in one person’s head? A method that lives in one head is a risk you should note. Ask for the past season’s schedule, shown as job counts by month with client names removed, and compare plans with what actually happened. Last, ask how delays are recorded and how often jobs run late. Late jobs often point to the weak spot in the sequence. Ask what the foreman or owner does on a day when two jobs need the same crew, and how that choice is made and recorded.
Key takeaways
- Walk through a typical job and mark where crews wait.
- Ask who does the concrete and how that trade is booked.
- Look at how the schedule is kept and who holds it.
Related reading
12 pages on the same subject, grouped by topic.
Selling
- Expert answerHow do I show buyers my construction clean-up crews' phased job schedule?
- Expert answerHow do I show buyers my frame shop’s custom framing order backlog?
- Expert answerHow do I present my concrete company’s builder and general contractor relationships to a buyer?
- Expert answerHow do I explain my concrete company’s pour scheduling and crew rotation to a buyer?
- Expert answerHow do I hand over my concrete crew’s finishing and curing routine to a new owner?
Due diligence
- Expert answerHow do I check what share of a frame shop’s work comes from conservation framing?
- Expert answerHow do I check a construction cleanup firm’s crew size on large jobs?
- Expert answerWhat should I know about a concrete company’s pump truck and boom operator crews?
- Expert answerHow do I check a kitchen showroom’s project install schedule and sub-trade crews?
- Expert answerHow does a home staging company schedule its trucks and install crews?
Sources
This answer is checked against primary sources. Links were last confirmed on the dates shown.
- 01Business Development Bank of CanadaGovernmentHow to conduct due diligence when buying a business
- 02Business Development Bank of CanadaGovernmentWhat are the steps to buying a business?
Deavo is an advertising and listings platform, not a brokerage, law firm or valuation firm. This page is general information, not legal, tax, accounting or valuation advice, and rules differ by province. Confirm anything you rely on with a qualified professional before you act on it.